Home > Activities > Maritime Works > Maintenance of signal buoy at the Torre Annunziata landing point of the Capri – Torre connection, February 2019

Maintenance of signal buoy at the Torre Annunziata landing point of the Capri – Torre connection, February 2019

Client: Terna Rete Italia

Description:

Maintenance and inspection of beacon conditions (above and below waterline);

Repost on the operation performed illustrated with submarine photos and videos.

© Poliservizi S.r.l. 2017. All Rights Reserved. Last update 10/03/2021

Powered by: LoseCtrl